Energex Building at Gasworks

DTS provided FKP with accurate set out points throughout the project in an efficient timeframe by utilising the latest in robotic survey technology.

Quality control was maintained through accurate records of all set out data that was consolidated for reporting purposes.
“As Constructed” data, such as pile locations, were located and reported to FKP on a daily basis to ensure pile driving was accurate and within tolerance. Site set out involved gridlines, piles, structural walls and lifts as well as external landscaping and civil works. Verticality checks on lift shafts and stair wells were performed on each level with certification provided for piles, heights and overall building position. The availability of our surveyors and reliable, practical advice were recognised by FKP throughout the duration of the project.

Project
Details

LOCATION
Breakfast Creek Road, Newstead

CLIENT
FKP Property Group

LOCAL AUTHORITY
Brisbane City Council

SCOPE
Green Star Commercial High Rise
Set out of Building and Civil Works
As Constructed Surveys
Certification
Monitoring