XL Precast, in association with VDM Consulting Engineers, worked with DTS through the design phase to obtain site contours and locate underground infrastructure.
These surveys allowed for confident design of the subsequent warehouse facility.
Throughout construction, DTS were responsible for ensuring that the structural elements of the building, including piers, hold down bolts and alignments of tilt panels were built in accordance with the design requirements. Acting in this capacity, the project progressed from concept to completion with the knowledge that the underlying information and construction based set out were consistently and accurately determined.
Project
Details
LOCATION
Iridium Drive, Paget, Mackay
CLIENT
XL Precast
LOCAL AUTHORITY
Mackay Regional Council
SCOPE
Industrial Warehouse
Initial Design Surveys
Hold Down Bolts
Strip Footings
Tilt Panel Alignments
Civil Infrastructure