132 kV Electrical Substation

DTS was engaged at the commencement of construction to provide civil set out for the control of bulk earthworks and pads. A significant component of this process was to provide conformance reporting and analysis with respect to quantities and earthworks reconciliation.

Subsequent requirements of the project saw DTS provide set out of grids and piers for structural elements and establishing the set out parameters for an earthed grid system that traversed the site. Accuracy and repeatability of measurement were key aspects in ensuring consistency was achieved throughout the course of construction. Despite the remote nature of the works, DTS demonstrated an ability to quickly and efficiently mobilise survey teams to ensure that construction timeframes could be achieved.

Project
Details

LOCATION
Wotonga, Moranbah

CLIENT
UGL

LOCAL AUTHORITY
Isaac Regional Council

SCOPE
High Voltage Electrical Substation
Set out of Hold Down Bolts
Set out of Earthed Grid Systems
Control of Bulk Earthworks
Control of Machine Guidance
As Constructed Documentation